Zach Ryan Capstone

For my capstone, I decided to install a water fountain at Camp Dark Waters (CDW). It would be placed in a corner of the field which would give kids easy access to water while they are playing running games in the hot summer sun. Without this fountain, the closest water fountain was a 5 to 10-minute walk. I decided to place a water fountain and a cool-down shower at the edge of the softball field. There was no pipeline that went to the softball field, so a majority of my project was digging the trench for the pipeline. I started digging in late March as the ground started to soften up, and with a few complications and unexpected circumstances popping up was not able to finish. Everything is set up and built, I just need to connect the pipeline which has to be completed while it is dry.

Link to Photos of Capstone: https://drive.google.com/drive/folders/137ar8XdGtY-wU0DjECANE8jQwcSfZQD6?usp=share_link

Bibliography: https://docs.google.com/document/d/1e_vK1iV8kfhdBFjFjVGq3UKuaNEqhpXhwHMExY-1x2U/edit?usp=sharing

Tarped trench
Tarped trench
Main Swamp
Main Swamp

Comments